产品展示 | 联系双虎 |

欢迎访问济南双虎围挡厂官网!

经理

13953162123

您先的位置:首页 > 新闻资讯 > 行业新闻

行业新闻

如何施工?济南百叶窗装修注意事项

文章发布: 发表时间:2017-07-18 10:58:06

1、拆窗之前最佳先替换门窗:由于拆窗过程会损坏室表里的墙体,最佳先替换门窗再进行下一步的装饰。小编主张大家门窗装饰时应选用高质量品牌的门窗,由于门窗型材的质量将决定全部门窗的层次、密封性和抗老化性等问题。

1, before the window to replace the best windows and doors: due to the removal of the window will damage the walls of the room inside and outside, the best alternative to the next door and window decoration. Xiao Bian advocate that we should use high-quality windows and doors windows and doors decoration, because the quality of the doors and windows profiles will determine the level of all doors and windows, sealing and anti-aging issues.
2、选购精度和强度好的济南百叶窗:小编主张必定要去正规的建材市场,特别是有些低质的塑料门窗,内衬钢质量低质,乃至没有衬钢,别的的配件也很差。
2, choose the precision and strength of the Ji'nan blinds: Xiaobian advocate must go to a regular building materials market, especially some low quality plastic lined steel doors and windows, quality of low quality, and no steel liner, other fittings are also very bad.
.
3、为什么门窗会变黄:有些塑料门窗的外观色彩过白或发灰,阐明其原料内的安稳成分不行,日久易老化变黄。
3, why the doors and windows will turn yellow: some plastic doors and windows of the appearance of white or gray color, to clarify the ingredients of the ingredients are not stable, easy to aging yellowing.
4、查看五金件是不是灵敏、顺畅:推拉窗窗框下部应有铝滑轨,便利其替换,窗扇的密封毛条基地应有固定片,这是推拉窗密封性好坏的关键。
4, check the hardware is not sensitive, smooth: sliding window sash should be the lower part of the aluminum slide, to facilitate its replacement, the base of the sealing edge of the window sash should be fixed, which is the key to the quality of the sliding window.
5、济南百叶窗装置:窗框与墙体之间应有发泡胶进行填充,且窗框表里侧必须用硅铜胶或密封胶进行密封避免渗水。牢记,装置完后,用户应揭掉保护膜,这么能够延伸门窗的使用寿命。
5, Ji'nan: shutter device between the window frame and the wall should be styrofoam filled, and the window frame exterior side must be sealed to prevent water leakage with silicone adhesive or sealant. Bear in mind, after the installation, the user should remove the protective film, so as to extend the service life of windows and doors.
济南百叶窗装饰注意事项:
Notes on the decoration of Venetian blinds in Ji'nan:
1、留缝隙过大:装饰时,刨修的师傅把空隙留得过大了,或许是装置时,没有与地面构成笔直,能够把门窗卸下来,刨修到符合为止,装置成笔直的就行了。笔直很难掌握的话可以在门窗框下垫片就能够找直了。
1, gap is too large: decoration, shaved the master on the space too large, perhaps no device, and the ground which is straight, the doors and windows to unload, shaved to date, a straight line device. It is difficult to master the words can be in the door and window frame gasket can be found straight.
2、五金件质量差:平开门的合页不正,这么也会致使框和门窗的水规整,将固定门的螺丝加固,调整到门窗和框套的倾斜度规整就行了。螺丝不要拧得太紧,不便利调整。假如一次拧紧的话会致使门窗太紧或许太松,有旷荡感。上螺丝要坚持平直,应当先钉一半,再拧紧。
2, hardware quality is poor: open the door hinge is not correct, so also can cause the box and doors and windows of the water is regular, will fix the screws of the door, adjust to the doors and windows and the box set of the degree of regularity on the line. Do not screw too tight, not easy to adjust. If a tightening would be too tight or too loose the doors and windows have boundless sense of promise. To adhere to the straight screws, nails should be first half, and then tighten.
3、门扇开关不顺利:通常是门的锁舌装置不正确,队形锁具的巨细不适合之外,还有一个最大的原因是锁舌与板没有对上,装置之前要做好符号。
3, the door switch is not smooth: usually the door latch device is not correct, the size of the lock is not suitable for the formation of the outside, there is one of the biggest reasons is that the lock tongue and the plate is not on the device to do a good job before the symbol.
4、推拉门吃力:通常构成原因是上下轨迹槽没有笔直,没在同一笔直,能够把轨迹先卸下来,用笔直尺对好上下轨迹和轨槽基地就行了。
4, push and pull the door hard: usually constitute the reason is the top and bottom of the track slot is not straight, not in the same straight, can be the first track down, with a straight ruler to the upper and lower trajectory and the groove base on the line.
5、其他注意事项:全体框架刚力度比较差,开关门窗艰难,劲风大雨天气晃动看看下面能不能处理:挑选的材料不适合,硬度受力程度不行。要是铝合金的材料就不符合要求。或许质量不过关。钢制门套,不符合标准,厚度在1.2以上,这是由于厂家装上去,你就不知道了,也无法量,所以在装置前,必定要问明白。装置时分不行标准。装置墙体不选用固定无效。
5, note: all the other frame has poor strength, switching windows difficult, wind rain shaking can look at the following treatment: the selection of materials not suitable for hardness, stress level. If the aluminum alloy material does not meet the requirements. Perhaps the quality does not pass. Steel door, do not meet the standards, the thickness is more than 1.2, this is because the factory installed, you do not know, can not, so in the device, must ask. Device not standard. Device wall is not fixed invalid.